Nghĩa của từ raymond concrete pile bằng Tiếng Việt

@Chuyên ngành kỹ thuật
@Lĩnh vực: xây dựng
-cừ bê tông Raymond

Đặt câu có từ "raymond concrete pile"

Dưới đây là những mẫu câu có chứa từ "raymond concrete pile", trong bộ từ điển Từ điển Anh - Việt. Chúng ta có thể tham khảo những mẫu câu này để đặt câu trong tình huống cần đặt câu với từ raymond concrete pile, hoặc tham khảo ngữ cảnh sử dụng từ raymond concrete pile trong bộ từ điển Từ điển Anh - Việt

1. That's one big pile of concrete.

2. That' s one big pile of concrete

3. Key words: dam, clay, concrete, earth pressure, embankment, pile.

4. Key words : lateral load test, piles, reinforced concrete, concrete-filled pipe, seismic, liquefaction, pile curvature.

5. Foundation piles, pile planks and structural elements made of concrete, reinforced concrete or of reinforced cement

6. Key words: tubular steel pile, reinforced concrete plug, bond, cyclic loading.

7. Only a pile of broken concrete, loose bricks and splintered lumber remained.

8. Construction method of pre-stressed cast-in -place concrete pile and structure thereof

9. Method for forming a cast-in-place concrete pile using a mold case

10. Pile joint (connection device for load-bearing pre-cast concrete piles) (EOTA ref

11. Special underground work, production of subterraneous curtains and concrete pile walls in soil

12. Champignon Concept, Saint-Raymond (Saint-Raymond, Quebec)

13. Sometimes Raymond goes by various nicknames including Raymond Michael Burgler and Raymond M Burgler.

14. I guess there's a lot worse people to die under a big pile of concrete with, huh?

15. Solution for A 0.36-m square prestressed concrete pile is to be driven in a Clayey soil

16. Method of manufacturing a reinforced oblong concrete product for longitudinal load-bearing purposes, and a driven pile

17. Installation, renewal and repair of bases for aerial contact lines, in concrete and/or using foundation pile systems

18. Concrete pile (1) for supporting structures a certain distance above ground level (M), such as viaducts and the like.

19. Key words: bored concrete piles, construction problems, load tests, soft weathered rock under artesian pressures, ultimate pile load capacities.

20. Raymond also answers to Raymond T Buffin, and perhaps a couple of other names.

21. The design of cast-in-place concrete piles is essentially empirical; hence, an examination of commercial pile load tests is of value.

22. With the drone of earth-moving equipment and the rhythmic clanging of the concrete-pile driver, the project began to take shape.

23. 3 Raymond works in that sawmill.

24. Bokes Creek Winery, Raymond, Ohio

25. Roxas also found a large pile of boxes underneath the concrete enclosure, approximately fifty feet from where the buddha statue had been discovered.