Nghĩa của từ predetermined of cost system bằng Tiếng Việt
@Chuyên ngành kinh tế
-chế độ phí tổn phần việc dự tính
Đặt câu có từ "predetermined of cost system"
1. Accelerated Cost Recovery System - Acrs: The accelerated cost recovery system was a U.S
2. a description of the cost recovery system;
3. • A more sustainable cost recovery system.
4. A shutter system operating at a predetermined frequency alternately opens and closes the optical path of each image.
5. Portal site cost distribution/recovery system
6. Array antenna apparatus for implementing predetermined beam width using predetermined number of antenna elements
7. FC Full cost system / Full cost with actual indirect costs reporting model
8. * A globally cost competitive manufacturing eco-system;
9. By means of a computer control system that cost $5 million.
10. System, method and program for agency cost estimation
11. This is the purpose of our Internal Cost Recovery (ICR) system.
12. The cost information provided by traditional cost management system is torturous in modern manufacturing industry.
13. Patient-controlled Analgesia (PCA) is a delivery system with which patients self-administer predetermined doses of analgesic medication to relieve their pain
14. Nowadays the time book can be a part of an integrated payroll system, or cost accounting system.
Ngày nay, sổ thời gian có thể là một phần của hệ thống bảng lương tích hợp, hoặc hệ thống kế toán chi phí.
15. An Autoresponder is a series of emails, usually focused on a specific topic, delivered in a predetermined sequence at predetermined intervals
16. It also looks at the current and future cost drivers and cost accelerators in the health system.
17. The Account Create and Cost Transfer System (Accts) consists of two modules, the Account Create module and the Cost Transfer module
18. The cost-accounting study also fell within the context of the planning system
19. The cost of the control of the standard cost system ways and means for discussion and analysis, strengthen enterprise management standardized production activities.
20. The sex of the embryo is predetermined at fertilization.
21. MoD valued its loss of the French sourced system as the historic cost of the system, adjusted for inflation and depreciation.
22. Scenario construction begins with the identification of predetermined elements.
23. The Accelerated Cost Recovery System (Acrs) is a depreciation method that assigns assets periods of cost recovery based on specific IRS criteria
24. Predetermined and actual acquisition costs
25. Dave Cress, a new cost accountant, proposed the use of a standard costing system.