Nghĩa của từ backfilling bằng Tiếng Việt

goại động từ
lấp (đất) lại

danh từ
đất lấp rãnh

Đặt câu có từ "backfilling"

Dưới đây là những mẫu câu có chứa từ "backfilling", trong bộ từ điển Từ điển Y Khoa Anh - Việt. Chúng ta có thể tham khảo những mẫu câu này để đặt câu trong tình huống cần đặt câu với từ backfilling, hoặc tham khảo ngữ cảnh sử dụng từ backfilling trong bộ từ điển Từ điển Y Khoa Anh - Việt

1. Backfilling Funnel Steps

Chèn lấp các bước kên

2. Earth Backfilling and Compaction 1

3. Different Types of Backfilling Material

4. Tips for Effective Backfilling and Grading

5. What are the Limitations of Data Backfilling

6. Backfilling shall be completed promptly as pipe laying advances

7. - Controlled Backfilling in the areas as specified and instructed

8. Backfilling is an important part of the construction process

9. Backfilling is an essential step in any construction work

10. Backfilling is not restricted to swarm prep brood nest reduction

11. Any time the brood volume is reduced Backfilling is applied

12. Backfilling is just one part of the pool removal process

13. 10/08 02221-2 Trenching, Backfilling, & Compaction B

14. Use the Backfiller compact utility attachment for easier, faster backfilling

15. Whatever the material, Backfilling a basement foundation puts a momentary stress on the walls. Let the concrete cure for at least a week before Backfilling (28 …

16. · Backfilling of excavated areas to restore natural drainage pattern Final Disposal

17. There are several different applications in which the process of Backfilling

18. Backfilling requires compacting layers of filler in 12-inch intervals until the material is …

19. One of the most effective ways to counter Backfilling is to open the brood nest

20. The time elapsed before Backfilling begins shall be subject to the approval of the Engineer

21. Backfilling of mined-out areas is a fundamental component of many underground mining operations

22. Proper Backfilling and grading are essential to avoiding serious structural problems in a home

23. These points must be kept in mind to take necessary action during excavation and Backfilling.

24. Annulling, Anvilling, appalling, apparelling, backfilling Win against friends in word games with this full list

25. Depending on the requirements for a specific project, trench Backfilling allows for different options for filling areas

26. In Backfilling process, there is a requirement of heavy machinery such as, BulldozerHydraulic excavator Dumper Tractor etc

27. Typically, Backfilling in the foundation is the process of putting back the soil in the foundation trench.

28. The Backhoe loader is ideal for digging trenches, loading dirt, planting trees or backfilling a foundation

29. Backfilling is the process of refilling a trench after all necessary excavation and construction work has been completed

30. The concrete floor and walls of the pool must be broken up and/or removed prior to Backfilling.

31. A wall extending at right angles to the Backfilling is the best support you can have for a wall.

32. When is comes to Backfilling, there are several methods in the construction industry to achieve the same results

33. Backfilling is a process of soil filling in the Foundation to increase strength and support stability to a foundation structure

34. Backfilling occurs when an employee is moved out of his or her assigned duties and is replaced by another employee.

35. Backfilling U/G utilities: The Excavated Area should be checked for utilities if any, accordingly precautions to be taken

36. Backfilling a pool is the process of filling the empty space left by the inground pool with gravel, sand, or dirt

37. The Metigy Data Backfilling collectors are limited by the amount of request that the various data APIs let us make

38. 20 The third alternative, and the most straight forward interpretation, was that the daub was contemporary with the backfilling of the drain.

39. Section 02220 Trenching, Backfilling and Compaction of Utilities Page 02220-1 City of Lynchburg, VA Manual of Specifications and Standard Details April 2020 02220 - TRENCHING, Backfilling AND COMPACTION OF UTILITIES (Revised 04/13/20) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1- General Clearing and Grubbing Minimum Pipe Cover

40. Backfilling provides a way of scaling down the entire brood-rearing operation so a smaller workforce can still get the job done

41. Backfilling is the process of replacing or reusing the soil that is removed during excavation construction to strengthen and support a structure’s foundation

42. Backfill a Pool With Dirt is a process and Backfilling is a process for all pool owners have to be aware of

43. Backfilling occurs after we hydro excavate, bringing in clean fill, sand, or crushed rock, and sometimes even flowable concrete should the job require it

44. In construction, Backfilling is the process of replacing or reusing the soil that is removed during building construction to strengthen and support a …

45. Excavation and Backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective

46. Usually, the Backfilling is a combination of stone, soil and other materials that were left over after the main portion of the project was completed

47. - Backfilling the areas around and over foundations, trenches, plinths, and under grade slabs of various structures with filling material duly approved by Engineer-in-charge

48. Backfilling is an employment law term where an employee is assigned to a new job and his/her position is filled by another employee

49. Backfilling: Physical Injury while working: Personals should not be stand on edge of the excavation.Proper distance/gap to be maintained from other personals while using tools

50. The pipe was instrumented with six biaxial strain gages to monitor strains during initial backfilling and earth-pressure cells for measuring load for about 1 year.