Nghĩa của từ earthwork bằng Tiếng Hungari

földmunka

Đặt câu có từ "earthwork"

Dưới đây là những mẫu câu có chứa từ "earthwork", trong bộ từ điển Từ điển Tiếng Anh - Hungari. Chúng ta có thể tham khảo những mẫu câu này để đặt câu trong tình huống cần đặt câu với từ earthwork, hoặc tham khảo ngữ cảnh sử dụng từ earthwork trong bộ từ điển Từ điển Tiếng Anh - Hungari

1. Avebury henge comprises of an enormous circular earthwork, 400m wide

2. 100 million cubic feet of earthwork were used to construct the bridge.

3. Synonyms for Breastwork include rampart, bastion, bulwark, earthwork, embankment, fortification, parapet, defence, barbican and barricade

4. As a consequence, the Americans were given time to begin the transformation of the canal into a heavily fortified earthwork.

5. Synonyms: Bulwark, barricade, breastwork, earthwork, rampart, bastion, parapet These nouns refer literally to structures used as a defense against attack

6. The sludge removal from tanks is the specialised sort of the earthwork, which covers three fields of the specialised activities – earthworks, building activities and waste disposal.

7. In Senegal, the initial studies underestimated the earthwork required for the Senoba-Ziguinchor road by approximately 8 % so as not to overrun the allotted budget.

8. This historically important linear defensive earthwork across the neck of the Cimbrian peninsula was initiated by the Danes in the Nordic Iron Age at some point before 500 AD.

9. More Than Reliable Earthwork After 30 years of working for his father at Ames Construction, Larry Ames set off on his own in 1995 to start Bemas Construction

10. The population of the parish was 1,764 people at the time of the 2001 census. Bourn Castle was located there and originally consisted of wooden buildings on an earthwork enclosure which was erected during the reign of …

11. The paper presents aspects of the following activity, throughout topographic methods, of the behavior in time of a bay placed on an earthwork soil resulted after the draining of a boggy area, established at the superior side form fillings and slaty irregular Alluviations.

12. This method statement defines the methodology for execution of Backfilling and compaction procedure related to earthwork & to describe the sequence of activities, utilization of resources, documents & drawings involved, maintaining & recording documents & data to meet project specific & contractual obligations and risk assessment for the activities involved.